Referenzen

References - Last update: 30.12.2014

Customer: West Coast Power


Project: Project: Kerawalapitiya 300 MW CCPP
Country & Utility: Sri Lanka WCP
Period: 2006-2014
Project-Description: Conceptual development study with 2 x 9E GT (heavy fuel oil firing); support WCP during bidder's clarification, preparing evaluation report, technical support during project execution act as owner's engineer. (Gas Turbines: GE 9E)

Period: 2014
Project –Description:
Plant rehabilitation and efficiency improvement  study for CCPP in order to fulfill new requirement for daily start up and shutdown

More>

Customer: UPM Schwedt


Project: 20 MW ST Power Station
Country & Utility: Germany/Industrial power station belonging to UPM paper mill
Period: 2006-2008/2009
Project-Description: Project description: Rehabilitation and plant heat rate improvement study of the existing industrial power plant. Preparing tender specification for ST and boiler, preparing evaluation report. Owners engineer during project execution.

Period: 2014

Project-Description: Plant economy improvement study in order to fulfill the requirements of the new energy strategy (Energiewende) in Germany.

Extraordinary Success Story>

Customer: HSE AG, Darmstadt

Project: GTKW Darmstadt 2 x 50 MW GT power station
Country & Utility: Germany/HSE
Period: 2007/2008/2009/2012
Project-Description: Conceptual study for 2 x 50/60 MW GT power station Project development, preparing tender specification Project development and support during bidder's clarification Preparing evaluation report Preparing plant license agreement. Owner’s Engineer during project execution & engineering services for arrangement planning, detail engineering, Project Management services, Planning and control activities, Schedule Monitoring, QS, Commissioning Support

More>

Customer: Gazprom Germania


Project: Projekt CCP with 3xGT6B; CCP 8xLM6000; CCP with GTSGT5 3000E
Country & Utility: IPP'S Europe 
Period: 2008/2011 
Project-Description: Execute due diligence for existing CCPP power plants in several countries Preparing conceptual study for 500 MW CCPP, Feasibility Studies for various projects, Tender and contract evaluation

Country & Utility: IPP'S Europe 
Period: 2012
Project-Description: Steam turbine damage investigation and due diligence for existing CCPP power plants in UK

Customer: ABB / Mannheim


Project: Taweelah B Cogeneration Steam Power Plant
Country & Utility: UAE /ADWEA
Period: 2003
Project-Description: Feasibility Study: Improvement of plant efficiency and increasing output of power and water by modification of steam turbine, BOP and additional desalination units.

Period: 2014

Project-Description: Feasibility study-CC- cogeneration plant at 130MW power output and 80MW district heating for a large car –manufacturer in Germany. The content of the study consider best economy alternatives (three of five); Investments; sensibility analyses; various plant layout in existing buildings.

Customer: ACWA Power- ILF

Project: Shoaiba III IWPP
Country & Utility: Saudi Arabia
Period: 2004- 2005
Project-Description: Consultant and engineering service for 900MW cogen steam power plant with a water production of194MIGD –plant concept development- preparation of minimum functional specification-detailed negotiation with preferred EPC contractor.

Project: Shuqaiq IWPP
Country & Utility: Saudi Arabia
Period: 2006
Project-Description: Consultant and engineering service for 900MW cogen steam power plant with a water production of 212.000m3/day –plant concept development- preparation of technical bid.


Customer: Babcock Service / Oberhausen


Project: Consultant and engineering service
Country & Utility: Various countries & utilities
Period: Since 2001
Project-Description: Modification of existing power plants for output and efficiency improvement; Conversion of existing power plants from oil fired to gas fired units.

Project: Reading Power station
Country & Utility: Countries in Europe & UAE
Period: 2004
Project-Description: Feasibility study for conversion of existing steam turbine unit into combined cycle power plant with 2x GT9FA.

Project: Coal/Gas fired Power station
Country & Utility: Countries in Europe & UAE
Period: 2011-2012
Project-Description: Engineering services for execution of Boiler Rehabilitation of existing steam turbine power plant.

Project: Orot Rabin 5&6, Rutenberg Power station
Country & Utility: Countries in Europe 
Period: 2011-2014
Project-Description: Engineering services for design of Boiler ECO-Flue gas bypass system and modification of existing boiler design for SCR installation.

Customer: Balcke Dürr / SPX


Project: Number of CCPP in USA
Country & Utility: USA/ serveral utilities
Period: 2003-2004
Project-Description: Performance and design analyse for air cooled condenser in combined cycle power plants.

Customer: HPE (BBP-Power Plants)/ Duisburg


Project: Taweelah A1
Country & Utility: UAE/ GTTPC
Period: 2001-2002
Project-Description: Consulting and Engineering service for cogen combined cycle power plant 1350MW /87MIGD.(Gas Turbines: GE 9E)

Project: Nyiregyhazi CCPP
Country & Utility: Hungary/ EON Hungary
Period: 2004
Project-Description: Conceptual development for cogen combined cycle power plant with GT H25 and offer support.

Project: Matra Repowering
Country & Utility: Hungary/ RWE Hungary
Period: 2004
Project-Description: Consultant and engineering service for repowering of existing steam power plant with GT for feedheating requirements.

Project: AIPM cogen CCPP
Country & Utility: AIPM
Period: 2005
Project-Description: Conceptual development of cogen combined cycle plant with GE Gas Turbines 9E, 200 MW size.(Gas Turbines: GE 9E)

Customer: DSD Ferrostaal / Essen


Project: HKW Barmen
Country & Utility: Germany/ WSW
Period: 2003-2005
Project-Description: Consultant and engineering service –concept development for cogen combined cycle power plant with existing steam turbine-analyse potential of existing steam turbine for CCPP application and modification. Consultant and engineering service during offer and project execution phase.

Project: Thermozulia CCPP
Country & Utility: Venezuela/ Enelgen
Period: 2004
Project-Description: Concept development of one Combined cycle power plant with 2x GT7FA- consultant and engineering service during offer phase.

Project: Fujairah Extension
Country & Utility: UAE/ ADWEA
Period: 2005
Project-Description: Concept development with 2x GE Gas Turbine 9E performance analyse of existing CCPP-preparation of entire power plant concept – consultant and engineering service during offer phase.

Project: Taweelah B new B Plant IWPP
Country & Utility: UAE/ Total
Period: 2004
Project-Description: Consultant and engineering service during offer phase- concept development for existing B plant as well as integration of new cogen CCPP into whole power plant structure.

Project:Andasol III
Country & Utility: Spain/ RWE –Thermal Solar Power Station.
 
Period:2013
Project-Description: Andasol III: RCA – Steam turbine LSB-1 damage by water hammer
 
Period: 2014
Project-Description: Andasol III: RCA of HP-turbine displacement
Project-Description: Trinidad CCPP –Modification of the Bypass System; Investigation of the existing start up system in order to improve start up time and start up procedure

Customer: Duisburger Stadtwerke

Project: HKW III
Country & Utility: Germany/ SWD
Period: 2003-2005
Project-Description: Feasibility Study to convert existing steam turbine unit into cogen combined cycle power plant with 2x GT6FA. Investigation of suitable performance ability belonging potential for district heating requirements. Consultant and engineering service during evaluation execution and commissioning phase analyse for further plant optimization.

Project: HKW I
Country & Utility: Germany/SWD
Period: 2004
Project-Description: Feasibility Study: repowering measures with GT’s for feed heating purposes of the existing steam power plant.

Customer: Energo West

Project: Rehabilitation of Marsa and Delimara Power Station
Country & Utility: Malta / Enemalta
Period: 2004
Project-Description: Feasibility Study to improve plant performance ;availability and CO2-reduction by conversion from heavy fuel oil to natural gas fired units- improvement of plant economy.

Project: Minsk Power Station
Country & Utility: Belarus /BelENERGO
Period: 2003
Project-Description: Feasibility Study: Rehabilitation of Minsk power station for improvement of plant economy and availability.

Customer: E.ON Kraftwerke


Project: KW Staudinger Block 4/5
Country & Utility: Germany/ E.ON Kraftwerke
Period: 2004
Project-Description: Investigation to Boiler performance and improvement of Boiler load and transient conditions

Project:
 KW Rostock
Country & Utility: Germany / E.ON Kraftwerke
Period: 2004
Project-Description: Investigation to Boiler performance

Customer: GIC International GmbH

Project: Mashad Power Station
Country & Utility: Iran/Mashad Power Generation
Period : 2012/2013
Project-Description: Preparing Feasibility study for Repowering of the existing GT power station and existing Steam power plant into a CCPP power station. Preparing Project Definition Phase

Customer: Hitachi Europe and Hitachi Ltd.


Project: BOA II
Country & Utility: Germany / RWE Rheinbraun
Period: 2003
Project-Description: Consultant and engineering service for a 1100 MW steam turbine unit offer.

Project: Boxberg R
Country & Utility: Germany / Vattenfall
Period: 2005
Project-Description: Consultant and engineering service for one 670 MW steam turbine offer.

Project: Moorburg
Country & Utility: Germany / Vattenfall
Period: 2005
Project-Description: Consultant and engineering service for 2x 800 MW steam turbine offer with district heating requirements.

Customer: MVV Mannheim / Solingen

Project: Various project activity
Country & Utility: Germany / Small industrial power plants
Period: 2002- 2004
Project-Description: Consultant and engineering service during project development- plant proposal and concept studies.

Customer: Middle East Region 1

Project:
 Cogen CCPP
Country & Utility: Middle East/ Oil Refinerie Ltd.
Period: 2010-2013
Project-Description: Preparing feasibility for development cogeneration plant with power output range of 150MW and 400t/h process steam demand at various pressure conditions (pressure range 110 bar/24 bar/5,5 bar and 1,5 bar). Preparing project development phase including environmental assessment to get license approval. Waiting for NTPA. Preparing RCA for damaged HRSG

Period: 2014
Project –Description: Preparing feasibility for development cogeneration plant with power output range of 340MW and 400t/h process steam demand at various pressure conditions (pressure range 110 bar/24 bar/5,5 bar and 1,5 bar). Preparing project development phase including environmental assessment to get license approval. Waiting for NTPA.

Extraordinary Success Story>

Customer: Middle East Region 2

Project:
 Cogen CCPP
Country & Utility: Middle East/ Steel mill and IT Company
Period: 2011
Project-Description: Preparing feasibility for development cogeneration plant with power output range of 60MW and 9000t/h cold water production.

Project: Feasibility study for  Repowering of existing steam power plant
Country & Utility: Middle East/ Refinery
Period: 2013
Project-Description: Biomass Power Plant
Country & Utility: Middle East: IPP
Period: 2013
Project –Description: Preparing RCA for the existing Biomass Boiler (PSSH-Damage)

Customer: RWE

Project: Tarragona cogen CCPP
Country & Utility: Spain/ Tarragona Power (Iberdrola/ RWE Solutions)
Period: 2002-2003
Project-Description: Consultant and engineering service during project execution phase for a 400MW cogen CCPP with GT 9FA.

Customer: RWE Power

Project: KW Frechen
Country & Utility: Germany/ RWE Power
Period: 2005
Project-Description: Analyse of damages and low plant availability. Investigation to improve plant availability and plant performance of 350MW cogen power plant consist of five units.

Project: VGT KEM Lingen
Country & Utility: Germany/ RWE Power
Period: 2010-2011
Project-Description: Engineering services for rehabilitation of 2x480MW gas fired steam power plant. Each Block equipped with 2xGT Trent 60LM WLE designed as wind box-solution, Commissioning Support

Customer: SES/Mibrag

Project: Rehabilitation study- Nox- reduction measures for small lignite power plant.
Country & Utility: Germany/ Deuben and Mumsdorf
Period: 2004
Project-Description: Investigation concerning suitable measures for Nox reduction.

Customer: Thomassen Turbine service

Project: Consultant and engineering service
Country & Utility: Various countries & utilities
Period: since 2004
Project-Description: Consultant and engineering service with LTSA's for gasturbines- investigation to install low nox burner systems in GT's; feasibility studies with GT's